أرسل لي وظائف مثل هذه
الجنسية
أي جنسية
جنس
غير مذكور
عدد الشواغر
1 عدد الشواغر
الوصف الوظيفي
الأدوار والمسؤوليات
Key Responsibilities
- Master Programme Development: Create and maintain integrated project master schedule incorporating design stages, procurement milestones, contractor mobilization, Construction
- Coordinate and integrate schedules from international consultants, AOR, cost consultants, contractor teams, and authority approval processes into unified project timeline
- Multi-Stakeholder Schedule Integration: Identify, monitor, and manage critical path activities across all project phases, implementing recovery strategies to maintain construction start date and overall project completion targets
- Critical Path Management: Plan and schedule contractor early involvement activities including site assessment, design reviews, procurement packages, and value engineering workshops to support timely GMP development
- Early Works Coordination : Develop detailed schedules for permit approval processes (NUCA, Municipality, Civil Defense, TAQA) and coordinate with design team to ensure timely submissions and approvals
- Authority Approval Scheduling : Coordinate resource deployment schedules across all consultant teams and contractors, ensuring optimal resource utilization while maintaining project momentum
- Resource Planning: Develop contingency plans and float management strategies to address potential delays while protecting critical milestones and maintaining existing building operations
- Risk-Based Scheduling : Conduct weekly progress reviews with all stakeholders, analyze schedule performance using SPI/CPI metrics, and prepare detailed progress reports for Employer and project team
- Progress Monitoring : Prepare rolling 30-day look-ahead schedules detailing critical activities, resource requirements, and stakeholder dependencies for proactive project coordination
- Look-Ahead Planning : Plan and coordinate interfaces between existing building operations, new construction activities, and tenant requirements to ensure zero disruption to ongoing business operations
- Interface Management : Align procurement schedules for long-lead items and early packages with design delivery and contractor mobilization requirements
- Procurement Schedule Coordination: Analyze schedule impacts of design changes, scope modifications, and authority requirements, providing time impact analysis using recognized delay analysis methodologies
- Change Impact Assessment
Education & Qualifications:
- Bachelor's degree in Civil Engineering, Construction Management, or related field
- PMP certification preferred
- Primavera P6 preferred
Experience:
- 7-10 years in construction planning for complex mixed-use developments
- Proven experience with multi-phase, multi-contractor project coordination
- Track record with operational building renovations and tenant coordination
- Experience with Egyptian construction market and authority approval processes
Technical Skills:
- Expert proficiency in Primavera P6 and MS Project
- Advanced knowledge of CPM scheduling methodologies
- Experience with Earned Value Management (EVM) systems
- Understanding of construction sequencing and logistics planning
- Knowledge of delay analysis techniques (TIA, Windows Analysis, Collapsed As-Built)
Software Proficiency:
- Primavera P6 (Advanced)
- MS Project Professional
- Power BI or similar analytics tools
- Advanced Excel
- Project reporting and visualization tools
الملف الشخصي المطلوب للمرشحين
Education & Qualifications:
- Bachelor's degree in Civil Engineering, Construction Management, or related field
- PMP certification preferred
- Primavera P6 preferred
Experience:
- 7-10 years in construction planning for complex mixed-use developments
- Proven experience with multi-phase, multi-contractor project coordination
- Track record with operational building renovations and tenant coordination
- Experience with Egyptian construction market and authority approval processes
Technical Skills:
- Expert proficiency in Primavera P6 and MS Project
- Advanced knowledge of CPM scheduling methodologies
- Experience with Earned Value Management (EVM) systems
- Understanding of construction sequencing and logistics planning
- Knowledge of delay analysis techniques (TIA, Windows Analysis, Collapsed As-Built)
Software Proficiency:
- Primavera P6 (Advanced)
- MS Project Professional
- Power BI or similar analytics tools
- Advanced Excel
- Project reporting and visualization tools
القطاع المهني للشركة
- العقارات
المجال الوظيفي / القسم
- هندسة
الكلمات الرئيسية
- Planning Manager
- PDS Projects
تنويه: نوكري غلف هو مجرد منصة لجمع الباحثين عن عمل وأصحاب العمل معا. وينصح المتقدمون بالبحث في حسن نية صاحب العمل المحتمل بشكل مستقل. نحن لا نؤيد أي طلبات لدفع الأموال وننصح بشدة ضد تبادل المعلومات الشخصية أو المصرفية ذات الصلة. نوصي أيضا زيارة نصائح أمنية للمزيد من المعلومات. إذا كنت تشك في أي احتيال أو سوء تصرف ، راسلنا عبر البريد الإلكتروني abuse@naukrigulf.com
Jones Lang LaSalle
Our people at JLL are shaping the future of real estate for a better world by combining world class services, advisory and technology for our clients. We are committed to hiring the best, most talented people and empowering them to thrive, grow meaningful careers and to find a place where they belong.
وظائف مماثلة
Planning Manager
The Second Construction Co Ltd CCTEB Dubai Branch
- 15 سنوات
- دبي - الإمارات العربية المتحدة
مدير التخطيط
GINCO Cont. Co. LLC
- 8 - 15 سنوات
- الإمارات العربية المتحدة - الإمارات العربية المتحدة (UAE)
مهندس تخطيط
DAR AL SABAH TRANSPORT LLC
- 5 - 7 سنوات
- أم القيوين - دولة الإمارات العربية المتحدة
مهندس تخطيط
AL BASTI MUKTHA LLC
- 5 - 10 سنوات
- دبي - الإمارات العربية المتحدة
مدير التخطيط - المدنية
AlRawabit International Recruitment LLC
- 10 - 15 سنوات
- أبوظبي - الإمارات العربية المتحدة